All,
I've got a single D3610 connected to a host via a single SAS cable on DP-1 on Controller 1. Is the a way to connect Controller 2 to my host so that if Controller 1 failed, Controller 2 would take over? Everything I've seen on HPE's docs talks about redudnant paths when using multiple enclosures, but since I have the one, it's not really helping me. Any help or feedback would be appreciated. Thanks!